- Steel structure Estimation (Metro rail & Industrial Steel Plant, Chemical Plant, Pipe rack, Platform, Roof Structures, Roof Dome, Commercial Steel Building, Architectural steel Canopy, Solar structures & Other Steel Miscellaneous items).
- Cable Tray System Estimation (Cable Tray, Cable Ladder & Cable Trunk)
- Monopole Estimation (Lighting Pole, Camera Pole, Pole for Telecommunication etc.)
- Material Submittal for Client Approval.
- Steel material property (Chemical & Mechanical) including grade as per ASTM, BS, JIS DIN etc.
- Paint selection and its application method including special functions (Fireproof, Heat insulation, climatic withstand)
- Familiar Hot dip Galvanized as per international standards ASTMA123, ASTM A78, ASTM A153/A153M.
- Time Study in Production Area or Plant.
- Support sales and marketing by developing automated system for costing.
الخبرة
|
|
|
- Estimation & Costing Head – From December 2012 – Present (10 Years)
Al-Ashoury Industries Riyadh
- Estimation & Costing Engineer - June 1999 to 2012 (12 Years)
Al-Babtain Power & Telecommunication Co., Riyadh, KSA.
Main Achievement
- 200 million Job handled in Riyadh Metro project Line-3. (Viaduct Steel Structure, Cable Tray, Fire Fighting Support)
Responsibilities:- Estimation, Costing, Material Approval and Invoice Certification etc..
Roles and Responsibilities
- Materials take off by manual or by using X-steel software based on Design Drawing
- Calculate the material Wt. & Surface area of the profile as per the BOM.
- Estimate of the material Cost as per the grade including Connection Bolt, Anchor Bolt, Leftover & Scrap based on client technical documents.
- Estimate the production Man Hours / Ton, Production period & production Cost based on structure.
- Calculate the Paint Price & Paint labor cost or hot dip galvanizing cost.
- Estimate Indirect Expenses, Administrative Overhead.
- Calculate the packing & Transportation expenses.
- Provide Unit Cost.
- Put Profit Margin and Calculate Total amount based on the Qty.
- Arrange the Remarks & Exclusion list of the Project.