beBee background
المحترفون
>
Riyadh
Chandrasekharan Roy

Chandrasekharan Roy

Structural steel estimation Engineer

تصنيع / ميكانيكي

Riyadh, منطقة الرياض‎

اجتماعي


عن Chandrasekharan Roy:

 

  • Steel structure Estimation (Metro rail & Industrial Steel Plant, Chemical Plant, Pipe rack, Platform, Roof Structures, Roof Dome, Commercial Steel Building, Architectural steel Canopy, Solar structures & Other Steel Miscellaneous items).
  • Cable Tray System Estimation (Cable Tray, Cable Ladder & Cable Trunk)
  • Monopole Estimation (Lighting Pole, Camera Pole, Pole for Telecommunication etc.)
  • Material Submittal for Client Approval.
  • Steel material property (Chemical & Mechanical) including grade as per ASTM, BS, JIS DIN etc.
  • Paint selection and its application method including special functions (Fireproof, Heat insulation, climatic withstand)
  • Familiar Hot dip Galvanized as per international standards ASTMA123, ASTM A78, ASTM A153/A153M.
  • Time Study in Production Area or Plant.
  • Support sales and marketing by developing automated system for costing.

الخبرة

 

  • Steel structure 
  • Communication Tower 
  • Fixed Cost & Variable Cost Analysis

 

  • Cable Tray 
  • Break Even Point Analysis
  • Manpower costing
  • Monopole
  • Time Study 
  • Overhead Calculation

 

  1. Estimation & Costing Head – From December 2012 – Present (10 Years)

Al-Ashoury Industries Riyadh 

 

  1. Estimation & Costing Engineer - June 1999 to 2012 (12 Years)                    

Al-Babtain Power & Telecommunication Co., Riyadh, KSA.       

                                                                        

Main Achievement         

  • 200 million Job handled in Riyadh Metro project Line-3. (Viaduct Steel Structure, Cable Tray, Fire Fighting Support)

Responsibilities:- Estimation, Costing, Material Approval and Invoice Certification etc..

 

Roles and Responsibilities

  • Materials take off by manual or by using X-steel software based on Design Drawing
  • Calculate the material Wt. & Surface area of the profile as per the BOM.
  • Estimate of the material Cost as per the grade including Connection Bolt, Anchor Bolt, Leftover & Scrap based on client technical documents.
  • Estimate the production Man Hours / Ton, Production period & production Cost based on structure.
  • Calculate the Paint Price & Paint labor cost or hot dip galvanizing cost.
  • Estimate Indirect Expenses, Administrative Overhead.
  • Calculate the packing & Transportation expenses.
  • Provide Unit Cost.
  • Put Profit Margin and Calculate Total amount based on the Qty.
  • Arrange the Remarks & Exclusion list of the Project.

التعليم

 

 

QualificationInstitution
Higher SecondaryKerala University, India
Diploma in Mechanical Engineering (3 years)              Board of Technical Education, India.

محترفون من نفس قطاع تصنيع / ميكانيكي مثل Chandrasekharan Roy

محترفون من قطاعات مختلفة بالقرب من Riyadh, منطقة الرياض‎