beBee background
المهنيون
>
Dammam
vinayak gada

اجتماعي


حول vinayak gada:

VINAYAK GADA

PIPING ENGINEER

Email ID: vinu.gada@gmail.com                                     

Contact # +966505237808   +918970943948 (Whatapp)                                                          


 

OBJECTIVE

 

To take up a challenging position with knowledge and experience in your Esteemed Organization and move along with latest Technology there by proving to be a positive sway in the advancement of the Organization.

9+ years of experience with EPC Company in oil and Gas industry


 

PROFESSIONAL SYNOPSIS

  • A dynamic EPC professional with 8+ years of rich Overseas & Domestic experience in Engineering & construction of Refineries and Power plants.
  • Currently associated with SAMSUNG ENGINEERING as a SR PIPING SUPERVISOR.
  • Proficient in managing Engineering & development related operations involving resource planning, in-process inspection, team building and co-ordination with internal / external departments.
  • An effective communicator with excellent relationship building & interpersonal skills. Strong analytical, problem solving & organizational abilities. Possess a flexible & detail oriented attitude.
  • Awareness of safety standards & regulations in Plants & refineries.


 

 

CORE COMPETENCIES


 

  • Project Planning & Management
  • Managing overall operations for executing projects related to Piping work involving scoping, initiating and resource mobilization within cost & time parameters.
  • Monitoring / tracking project operations with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of projects. 


 

  • Engineering
  • Review all drawings & specification study, quotation enquiry study & finalization, vendor selection & finalization, schedule for development, first sample approval, and final design approval.
  • Preparing MTO/BOM and coordinating for the selection of suitable materials for various components to meet design reliability and quality goals.
  • Reviewing the engineering / design changes & resolving quality related problems associated with design.


 

  • Man Power Management & Construction
  • Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency. 
  • Working on succession planning of the workforce, rendering technical guidance to the staff, management activities, appraising the member’s performance & providing feedback.


 

 

PROFESSIONAL CERTIFICATION


 

  • B.E in MECHANICAL ENGINEERING from Visvesvaraya Technological University Belgaum.
  • PG Diploma in Piping Engineering from Institute of Piping Engineering and Building services.
  • Auto cad version (2006-2011).


 

ORGANISATIONAL EXPERIENCE



 

  • Since March 2014 to present working with SAMSUNG ENGINEERING, as a SR. PIPING SUPERVISOR.


 

Projects Handled

Project-1

Project Title              : Hawiyah  Unayzah Gas Reservoir Storage Project (SG6427)

Client                          :  SAUDI ARAMCO

Designation              :    Sr. Piping Supervisor

Duration                   : From jULY-21 to TILL


 

Project-2

Project Title              : Clean Fuel Project MAB-1, Kuwait

Client                          : KNPC (Kuwait National Petroleum Company)

Designation               :    Sr. Piping Supervisor

Duration                   : From Mar-17 to Oct-20


 

Project-3

Project Title              : Luberef Yanbu Refinery Expansion Project

Client                          : LUBEREF (Lubricating oil Refinery)

Designation               : Sr. Piping Supervisor

Duration                    : From Feb-16 to feb-17


 

Project-4

Project Title              :Samsung Engineering Saudi Arabia (Fabrication shop) 

Client                          : SAUDI ARAMCO

Designation              :    Sr. Piping Supervisor

Duration                   :      From Aug-14 to Jan-16

              

Job Responsibilities:


 

  • Check & review all installation procedures, Method of statements, Risk assessments, piping arrangement drawings, Piping & Instrumentation Diagram as well as latest revision drawing & ISO Drawing.
  • Handling all technical queries and investigating all field piping related problems, including the drawing of field sketches whenever necessary. 
    • Site co-ordination, Work front availability preparation, As-built drawing preparation.
  • Developed a plan of action to execute and monitor the performance of the projects in all phases of cycle.
  • Reviewed contractor’s manpower plan in their relevance against the estimated construction man-hours peak manpower requirements, compatibility of the schedule project curves and milestone schedules.
    • QA-QC punch list & NCR clearance.
    • Detail engineering co-ordination with counterpart companies, Design Consul ties and  vendors
    • Providing Co-ordination, Technical Support & material delivering assurance to construction team as per the requirements of the project.
    • Monitoring the contractor’s scheduling approach and performance in order to identify any early deviation or adverse trends that may be detrimental to company interest.
    • Provide Material Requisition (MR) review and Technical Evaluations support to Procurement dept.
    • To interact with Client representatives (PMTs & PIDs) and Vendors for all the technical topics and Design review meetings  impacting on the project both in time and costs
    • Raising Interface queries (IQ), Technical queries (TQ) and Waiver Requests to client in order to clarify technical aspects of contract.
  • Responsible for resolving quality related issues in site, as per the approved Procedures.
  • Facilitate decision-making to assist the PMT Lead Project Engineer in terms of project plan/schedule, status performance and forecast.
  • Prepare daily permit and construction progress report and submit to the PMT Lead Project Engineer.
  • Co-ordinate all site activities and ensure implementation of efficient construction practices that is in accordance with established project safety programmed.
  • Co-ordinate with planning engineer in the preparation of work activities with time frame on every job.
  • Involve in heat tube installation, welding, Pneumatic test and pigging to HEAT TRACING tubes.
  • Prepare material take off summary on all pipe and fitting in each drawing for every line.
  • Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and pre-commissioning requirements of the projects.
  • Implement safety rules and regulations as applicable to subordinate in order to attain better progress of work and excellent safety performance rating.
  • Assist piping supervisors and foremen in lay outing and template fabrication to fit on it excellent dimensions.
  • Perform all the official documentations and report pertaining to construction matter.
  • Attend interface meetings between the current project and other projects and organizations involved in the project.
  • Taking preventive and predictive actions for the non-conformities observed in site.
  • Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency. 


 

Feb-2012 to Feb 2014 Worked with SUNGDO ENGINEERING AND CONSTRUCTIONS Sponsor of ALKULAIB INTERNATIONAL AND TRADING CO. KUWAIT


 

Projects Handled

Project-1

Project Title        :      LPG TRAIN-4

Main Contractor       :      DAELIM ENGINEERING AND CONSTRUCTIONS

Client                    :      KNPC (Kuwait National Petroleum Company)

Designation              :      Piping Supervisor

Duration                   :       From JAN-13 to FEB-2014


 

Project-2

Project Title        :      GAS BS-132 ENHANCEMENT TO GAS BS-131

Main Contractor       :      SK ENGINEERING AND CONSTRUCTIONS

Client                    :      KOC (Kuwait Oil Company)

Designation              :      Piping Supervisor

Duration                   :       From Feb-12 to Jan-2013

          

Job responsibilities:


 

  • Check And Review ISO Drawing And Work Perform As Built Drawing.
  • Check and supervise the work of piping installation & erection of structural pipe support.
  • Implementing good project control in cost, manpower, materials and equipment.
  • Provide timely reports and information to higher management to remove obstacles and resolve issues as they arise.
  • Responsible for Preparation of Test Diagram/Test Plans, Marked-up P&ID and Test Packages based on System Definition and System Marked-up Provided by the Contractors.
  • Responsible for Preparation of WMS (work method statement) and JSA (job safety analysis) for all kind of testing activities such as Hydro, Pneumatic and service test.
  • Coordinating with design engineers to review and update drawings as per site conditions when ever required.
  • Responsible for closing out all kinds of document and engineering punches issued during walkthrough.
  • Coordinating with all HVAC, Plumbing, Sanitary and Fire Fighting systems at the construction site. 
  • Ensures that these works are in accordance with the specifications in the construction plans.
  • Coordinates closely with the client and other parties involved with regards to changes in plans/execution, site activity problems and progress of the project.
  • Prepares timetable indicating the activities to be undertaken, manpower required and the estimate hour required for the activity.
  • Verification of the project site in comparison with the approved layout and utilities.
  • Monitors the progress of the project being executed including the review of the actual result against the plan with the objective of coming up with all necessary courses of action
  • Inspection of the quality of installation done and testing of equipment and turning it over for clients approval.
  • Supervision of site activities.
  • Supervision of temporary maintenance facilities.
  • Planning & scheduling of various activities involved in project execution.





 

      Oct-2010 to Jan 2012 Worked with AQUA DESIGNS AND CONSTRUCTIONS


 

     Projects Handled

Project-1

Project Title            :      CROSS COUNTRY PIPELINE PROJECT FROM KOCHI REFINERY TO AIRPORT                                                                                                                                                                                                                                                                                                                          

Client                      :       BPCL

Designation            :      Piping Supervisor

Duration                 :       From Mar-2011 to JAN-2012


 

Project-2

Project Title              :      ITC (Paper and Pulp Industry)  

Client                        :      ITC Paper Industry, Andhra Pradesh

Designation              :      Piping Supervisor

Duration                   :       From Oct-2010 to Mar-2011


 

Job responsibilities:

  • Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
  • Monitoring & coordinating with site supervisors and arranging the required resource to complete the planned work in scheduled time.
  • Preparing piping work progress report, monthly forecast report and attending progress review meeting with EPC contractor.
  • Coordinating QA/ QC Department for NDT, heat treatment and pressure testing of pipeline.
  • Ensure availability of latest approved documents, drawings and also ensuring that the supervisor and his team understanding it fully. Preparing final BOQ and submitting to client for approval.
  • Identifying the modification works, preparing variation orders and submitting to client.
  • Arranging daily, weekly and monthly progress report. Submitting monthly invoice based on the progress and submitting to the client. Preparing variation orders for the extra work done.



 

    IT SKILLS


 

  • Operating System    :           Windows 95 / 98 /2000 / XP / VISTA/7/8, MS Office
  • Designing Packages    :    PDMS, SP3D,AUTOCAD (2D&3D) 2011, Micro Station, Solid Edge V19,Navis 

PASSPORT DETAILS

  • PASSPORT NO.     :     u2796025
  • DATE OF ISSUE    :     18/11/2020
  • DATE OF EXPIRY   :     17/10/2030


 

PERSONAL DETAILS

  • Date of Birth            :21-March-1988
  • Nationality                : Indian
  • Marital Status            : Married
  • Permanent Address  : 2-4-31 Near Jamma Masjid Chowabara Road Bidar (585403), Karnataka, India.

                                                                

    Declaration:-


 

I hereby declare that the above written particulars are true to the best of my knowledge and belief.



 

                                                                                            (vinayak gada)     

تجربة

VINAYAK GADA

PIPING ENGINEER

Email ID: vinu.gada@gmail.com                                     

Contact # +966505237808   +918970943948 (Whatapp)                                                          


 

OBJECTIVE

 

To take up a challenging position with knowledge and experience in your Esteemed Organization and move along with latest Technology there by proving to be a positive sway in the advancement of the Organization.

9+ years of experience with EPC Company in oil and Gas industry


 

PROFESSIONAL SYNOPSIS

  • A dynamic EPC professional with 8+ years of rich Overseas & Domestic experience in Engineering & construction of Refineries and Power plants.
  • Currently associated with SAMSUNG ENGINEERING as a SR PIPING SUPERVISOR.
  • Proficient in managing Engineering & development related operations involving resource planning, in-process inspection, team building and co-ordination with internal / external departments.
  • An effective communicator with excellent relationship building & interpersonal skills. Strong analytical, problem solving & organizational abilities. Possess a flexible & detail oriented attitude.
  • Awareness of safety standards & regulations in Plants & refineries.


 

 

CORE COMPETENCIES


 

  • Project Planning & Management
  • Managing overall operations for executing projects related to Piping work involving scoping, initiating and resource mobilization within cost & time parameters.
  • Monitoring / tracking project operations with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of projects. 


 

  • Engineering
  • Review all drawings & specification study, quotation enquiry study & finalization, vendor selection & finalization, schedule for development, first sample approval, and final design approval.
  • Preparing MTO/BOM and coordinating for the selection of suitable materials for various components to meet design reliability and quality goals.
  • Reviewing the engineering / design changes & resolving quality related problems associated with design.


 

  • Man Power Management & Construction
  • Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency. 
  • Working on succession planning of the workforce, rendering technical guidance to the staff, management activities, appraising the member’s performance & providing feedback.


 

 

PROFESSIONAL CERTIFICATION


 

  • B.E in MECHANICAL ENGINEERING from Visvesvaraya Technological University Belgaum.
  • PG Diploma in Piping Engineering from Institute of Piping Engineering and Building services.
  • Auto cad version (2006-2011).


 

ORGANISATIONAL EXPERIENCE



 

  • Since March 2014 to present working with SAMSUNG ENGINEERING, as a SR. PIPING SUPERVISOR.


 

Projects Handled

Project-1

Project Title              : Hawiyah  Unayzah Gas Reservoir Storage Project (SG6427)

Client                          :  SAUDI ARAMCO

Designation              :    Sr. Piping Supervisor

Duration                   : From jULY-21 to TILL


 

Project-2

Project Title              : Clean Fuel Project MAB-1, Kuwait

Client                          : KNPC (Kuwait National Petroleum Company)

Designation               :    Sr. Piping Supervisor

Duration                   : From Mar-17 to Oct-20


 

Project-3

Project Title              : Luberef Yanbu Refinery Expansion Project

Client                          : LUBEREF (Lubricating oil Refinery)

Designation               : Sr. Piping Supervisor

Duration                    : From Feb-16 to feb-17


 

Project-4

Project Title              :Samsung Engineering Saudi Arabia (Fabrication shop) 

Client                          : SAUDI ARAMCO

Designation              :    Sr. Piping Supervisor

Duration                   :      From Aug-14 to Jan-16

              

Job Responsibilities:


 

  • Check & review all installation procedures, Method of statements, Risk assessments, piping arrangement drawings, Piping & Instrumentation Diagram as well as latest revision drawing & ISO Drawing.
  • Handling all technical queries and investigating all field piping related problems, including the drawing of field sketches whenever necessary. 
    • Site co-ordination, Work front availability preparation, As-built drawing preparation.
  • Developed a plan of action to execute and monitor the performance of the projects in all phases of cycle.
  • Reviewed contractor’s manpower plan in their relevance against the estimated construction man-hours peak manpower requirements, compatibility of the schedule project curves and milestone schedules.
    • QA-QC punch list & NCR clearance.
    • Detail engineering co-ordination with counterpart companies, Design Consul ties and  vendors
    • Providing Co-ordination, Technical Support & material delivering assurance to construction team as per the requirements of the project.
    • Monitoring the contractor’s scheduling approach and performance in order to identify any early deviation or adverse trends that may be detrimental to company interest.
    • Provide Material Requisition (MR) review and Technical Evaluations support to Procurement dept.
    • To interact with Client representatives (PMTs & PIDs) and Vendors for all the technical topics and Design review meetings  impacting on the project both in time and costs
    • Raising Interface queries (IQ), Technical queries (TQ) and Waiver Requests to client in order to clarify technical aspects of contract.
  • Responsible for resolving quality related issues in site, as per the approved Procedures.
  • Facilitate decision-making to assist the PMT Lead Project Engineer in terms of project plan/schedule, status performance and forecast.
  • Prepare daily permit and construction progress report and submit to the PMT Lead Project Engineer.
  • Co-ordinate all site activities and ensure implementation of efficient construction practices that is in accordance with established project safety programmed.
  • Co-ordinate with planning engineer in the preparation of work activities with time frame on every job.
  • Involve in heat tube installation, welding, Pneumatic test and pigging to HEAT TRACING tubes.
  • Prepare material take off summary on all pipe and fitting in each drawing for every line.
  • Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and pre-commissioning requirements of the projects.
  • Implement safety rules and regulations as applicable to subordinate in order to attain better progress of work and excellent safety performance rating.
  • Assist piping supervisors and foremen in lay outing and template fabrication to fit on it excellent dimensions.
  • Perform all the official documentations and report pertaining to construction matter.
  • Attend interface meetings between the current project and other projects and organizations involved in the project.
  • Taking preventive and predictive actions for the non-conformities observed in site.
  • Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency. 


 

Feb-2012 to Feb 2014 Worked with SUNGDO ENGINEERING AND CONSTRUCTIONS Sponsor of ALKULAIB INTERNATIONAL AND TRADING CO. KUWAIT


 

Projects Handled

Project-1

Project Title        :      LPG TRAIN-4

Main Contractor       :      DAELIM ENGINEERING AND CONSTRUCTIONS

Client                    :      KNPC (Kuwait National Petroleum Company)

Designation              :      Piping Supervisor

Duration                   :       From JAN-13 to FEB-2014


 

Project-2

Project Title        :      GAS BS-132 ENHANCEMENT TO GAS BS-131

Main Contractor       :      SK ENGINEERING AND CONSTRUCTIONS

Client                    :      KOC (Kuwait Oil Company)

Designation              :      Piping Supervisor

Duration                   :       From Feb-12 to Jan-2013

          

Job responsibilities:


 

  • Check And Review ISO Drawing And Work Perform As Built Drawing.
  • Check and supervise the work of piping installation & erection of structural pipe support.
  • Implementing good project control in cost, manpower, materials and equipment.
  • Provide timely reports and information to higher management to remove obstacles and resolve issues as they arise.
  • Responsible for Preparation of Test Diagram/Test Plans, Marked-up P&ID and Test Packages based on System Definition and System Marked-up Provided by the Contractors.
  • Responsible for Preparation of WMS (work method statement) and JSA (job safety analysis) for all kind of testing activities such as Hydro, Pneumatic and service test.
  • Coordinating with design engineers to review and update drawings as per site conditions when ever required.
  • Responsible for closing out all kinds of document and engineering punches issued during walkthrough.
  • Coordinating with all HVAC, Plumbing, Sanitary and Fire Fighting systems at the construction site. 
  • Ensures that these works are in accordance with the specifications in the construction plans.
  • Coordinates closely with the client and other parties involved with regards to changes in plans/execution, site activity problems and progress of the project.
  • Prepares timetable indicating the activities to be undertaken, manpower required and the estimate hour required for the activity.
  • Verification of the project site in comparison with the approved layout and utilities.
  • Monitors the progress of the project being executed including the review of the actual result against the plan with the objective of coming up with all necessary courses of action
  • Inspection of the quality of installation done and testing of equipment and turning it over for clients approval.
  • Supervision of site activities.
  • Supervision of temporary maintenance facilities.
  • Planning & scheduling of various activities involved in project execution.





 

      Oct-2010 to Jan 2012 Worked with AQUA DESIGNS AND CONSTRUCTIONS


 

     Projects Handled

Project-1

Project Title            :      CROSS COUNTRY PIPELINE PROJECT FROM KOCHI REFINERY TO AIRPORT                                                                                                                                                                                                                                                                                                                          

Client                      :       BPCL

Designation            :      Piping Supervisor

Duration                 :       From Mar-2011 to JAN-2012


 

Project-2

Project Title              :      ITC (Paper and Pulp Industry)  

Client                        :      ITC Paper Industry, Andhra Pradesh

Designation              :      Piping Supervisor

Duration                   :       From Oct-2010 to Mar-2011


 

Job responsibilities:

  • Handling all piping technical queries and investigating all field pipe work related problems, including the drawing of field sketches when necessary.
  • Monitoring & coordinating with site supervisors and arranging the required resource to complete the planned work in scheduled time.
  • Preparing piping work progress report, monthly forecast report and attending progress review meeting with EPC contractor.
  • Coordinating QA/ QC Department for NDT, heat treatment and pressure testing of pipeline.
  • Ensure availability of latest approved documents, drawings and also ensuring that the supervisor and his team understanding it fully. Preparing final BOQ and submitting to client for approval.
  • Identifying the modification works, preparing variation orders and submitting to client.
  • Arranging daily, weekly and monthly progress report. Submitting monthly invoice based on the progress and submitting to the client. Preparing variation orders for the extra work done.



 

    IT SKILLS


 

  • Operating System    :           Windows 95 / 98 /2000 / XP / VISTA/7/8, MS Office
  • Designing Packages    :    PDMS, SP3D,AUTOCAD (2D&3D) 2011, Micro Station, Solid Edge V19,Navis 

PASSPORT DETAILS

  • PASSPORT NO.     :     u2796025
  • DATE OF ISSUE    :     18/11/2020
  • DATE OF EXPIRY   :     17/10/2030


 

PERSONAL DETAILS

  • Date of Birth            :21-March-1988
  • Nationality                : Indian
  • Marital Status            : Married
  • Permanent Address  : 2-4-31 Near Jamma Masjid Chowabara Road Bidar (585403), Karnataka, India.

                                                                

    Declaration:-


 

I hereby declare that the above written particulars are true to the best of my knowledge and belief.



 

                                                                                            (vinayak gada)     

التعليم

BE mechanical 

محترفون من قطاعات مختلفة بالقرب من Dammam, المنطقة الشرقية

وظائف بالقرب من Dammam, المنطقة الشرقية

  • Hilton

    كاتب استقبال بفرع هيلتون بالخبر

    تم العثور عليها في: DrJobAR SA A2 - منذ أسبوع


    Hilton الخبر, المملكة العربية السعودية

    1. التعليم والخبرة: · - عادة ما يكون لدى كتّاب الاستقبال شهادة بكالوريوس أو دورة تدريبية ذات صلة. الخبرة السابقة في وظيفة استقبال قد تكون مفيدة. · 2. مهارات الاتصال: · - مهارات اتصال ممتازة للتفاعل بفعالية مع الزوار والموظفين. يجب أن يكون لديك لباقة وأسلوب لبق في التعامل مع الآخر ...

  • جامعة الإمام عبدالرحمن بن فيصل

    Assistant Professor of Computer Science

    تم العثور عليها في: Talent SA A C2 - منذ أسبوع


    جامعة الإمام عبدالرحمن بن فيصل Dammam, المملكة العربية السعودية

    1- The applicant must have the requiredacademic qualification from a university accredited by the Ministryof Education, provided that priority is given to the holder of thequalification and the highest average; And that all the academicqualifications obtained by the applicant for ...

  • Hilton

    شيف تنفيذي للمجموعة بفرع هيلتون بالخبر

    تم العثور عليها في: DrJobAR SA A2 - منذ أسبوع


    Hilton الخبر, المملكة العربية السعودية

    التعليم والتدريب:شهادة في الطهي أو فنون الطهي من مدرسة طهي معترف بها. الدراسات العليا في فنون الطهي تكون مفيدة. · الخبرة:خبرة غنية في مجال الطهي وإعداد الأطعمة. يفضل أن تكون لديه خبرة سابقة كشيف تنفيذي لمدة سنوات. · مهارات الطهي:إتقان مهارات الطهي والتحضير بمستوى عالي، بما في ذلك ...